Menu
Your Cart

KOB brush card electronic access control system set Electromagnetic lock glass magnetic lock dual -door password access control machine all -in -one

KOB brush card electronic access control system set Electromagnetic lock glass magnetic lock dual -door password access control machine all -in -one
KOB brush card electronic access control system set Electromagnetic lock glass magnetic lock dual -door password access control machine all -in -one
KOB brush card electronic access control system set Electromagnetic lock glass magnetic lock dual -door password access control machine all -in -one
KOB brush card electronic access control system set Electromagnetic lock glass magnetic lock dual -door password access control machine all -in -one
KOB brush card electronic access control system set Electromagnetic lock glass magnetic lock dual -door password access control machine all -in -one
KOB brush card electronic access control system set Electromagnetic lock glass magnetic lock dual -door password access control machine all -in -one
KOB brush card electronic access control system set Electromagnetic lock glass magnetic lock dual -door password access control machine all -in -one
KOB brush card electronic access control system set Electromagnetic lock glass magnetic lock dual -door password access control machine all -in -one
KOB brush card electronic access control system set Electromagnetic lock glass magnetic lock dual -door password access control machine all -in -one
KOB brush card electronic access control system set Electromagnetic lock glass magnetic lock dual -door password access control machine all -in -one
KOB brush card electronic access control system set Electromagnetic lock glass magnetic lock dual -door password access control machine all -in -one
US$9.76
  • Stock: In Stock
  • Model: 1085601160420
  • Weight: 3.06kg
  • SKU: 1085601160420

How to Order & Pay

Shipping: Free Shipping & Customs Tax included are subject to change, please refer to the quote you received.

Delivery: Accurate and precise order tracking. Learn more

Package Safety: Refund for your damaged or lost package. Learn more

Payments:


Shop with confidence

Inspect item by item, verify, conduct quality checks, and upload authentic photos of the products.

Consolidate and repackage all items to reduce international logistics costs and facilitate international transportation.

Our customer service is always here if you need help. Click here to chat with us or Chat on WhatsApp

Please log in to view detailed product descriptions and select product options.

More ways to get help

1. Please click "HELP" to get more information.

2. Contact us on sales@chinaglobalmall.com

3. Chat now or Chat on WhatApp

Tips for reducing the shipping cost

1)Get rid of the original packing, for example, if you buy a pair of shoes, you could get rid of the shoebox which will save a lot for volumetric weight.

2)The shipping cost is normally charged by every 0.5KG. So if you buy a product that is only 0.1KG then you might consider buying 2-3 PCS per time which will not add more shipping cost for your order.

Volumetric Weight

Volumetric weight refers to the overall size of a parcel and is measured in volumetric kilograms. Volumetric weight can be calculated by multiplying the length, width, and height of a parcel (in cm) and dividing that figure by 5000 (some carriers use a divisor of 6000/7000 and etc).

Prohibited Items (but not limited) for International Shipping,

  • Cigarette
  • Alcohol
  • Liquid
  • Knife/Scissor
  • Toy Gun
  • Seeds
  • Live Animals
  • Real Flowers

The following items (but not limited) might only could ship with specific logistic lines,

  • Cream
  • Cosmetics
  • Snacks
  • Medicine
Women's Clothing (Coats & Jackets, Dresses, T-Shirts, Tops, Suits)
Standard Size
China (cm) 160-165/84-86 165-170 / 88-90 167-172 / 92-96 168-173 / 98-102 170-176 / 106-110
International XS S M L XL
USA 2 4-6 8-10 12-14 16-18
Europe 34 34-36 38-40 42 44
Bra - Under bust
Standard Size
China
(cm)
76.2 81.3 86.4 91.5 96.5 101.6 106.7 112 117 122 127 132 137 142
USA 30 32 34 36 38 40 42 44 46 48 50 52 54 56
UK 30 32 34 36 38 40 42 44 46 48 50 52 54 56
Europe   70 75 80 85 90                
France   85 90 95 100 105                
Italy   1 2 3 4 5                
Bra - Cup size
Standard Size
China A B C D E                  
USA AA A B C D DD DDD/E F FF G GG H HH J
UK AA A B C D DD E F FF G GG H HH J
Europe AA A B C D E F              
France AA A B C D E F              
Italy   B B/none C D DD E F            
Women's Underwear
Standard Size
China S M L XL XXL XXXL
International XS S M L XL XXL
USA 2 4 6 8 10 12
UK 6 8 10 12 14 16
Europe 32 34 36 38 40 42
France 34 36 38 40 42 44
Italy 38 40 42 44 46 48
Women's Shoes
Standard Size
Length (cm) 22.8 23.1 23.5 24.1 24.5 25.1 25.7 26 26.7 27.3 27.9 28.6 29.2
China 35.5 36 37 38 39 40 41.5 42 43 44.5 46 47 48
USA 5 5.5 6 7 7.5 8.5 9.5 10 10.5 12 13 14 15.5
UK 2.5 3 3.5 4.5 5 6 7 7.5 8 9.5 10.5 11.5 13
Europe 35 35.5 36 37.5 38 39 41 42 43 44 45 46.5 48.5
Men's Clothing (Coats & Jacketst,T-Shirts,Suits)
Standard Size
China (cm) 165 / 88-90 170 / 96-98 175 / 108-110 180 / 118-122 185 / 126-130
International S M L XL XXL
Men's Clothing (Shirts)
Standard Size
China (cm) 36 - 37 38 - 39 40 - 42 43 - 44 45 - 47
International S M L XL XXL
Men's Clothing (Pants)
Size (cm) 42 44 46 48 50
Waist (cm) 68 - 72 cm 71 - 76 cm 75 - 80 cm 79 - 84 cm 83 - 88 cm
Outseam (cm) 99 cm 101.5 cm 104 cm 106.5 cm 109 cm
Men's Underwear
Standard Size
China(cm) 72-76 76-81 81-87 87-93 93-98
International S M L XL XXL
USA(inch) 28-30 30-32 32-34 34-38 38-42
Men's Shoes
Standard Size
Length(cm) 24.5 25.1 25.7 26 26.7 27 27.6 28.3 28.6 28.9
China 39.5 41 42 43 44 44.5 46 47 47.5 48
USA 6 7 8 8.5 9.5 10 11 12 12.5 13
UK 5.5 6.5 7.5 8 9 9.5 10.5 11.5 12 12.5
Europe 38 39 41 42 43.5 44 45 46 46.5 47
长度Length
Imperial英制 Meric公制
1 inch[in] 英寸 ---- 2.54 cm 厘米
1 foot[ft] 英尺 12 in 英寸 0.03048 m 米
1 yard[yd] 码 3 ft 英尺 0.9144 m 米
1 mile[mi] 英里 1760 yd 码 1.6093 km 千米
1 int nautical mile[inm] 海里 2025.4 yd 码 1.853 km 千米
面积Area
Imperial英制 Meric公制
1 sq inch[in2] 平方英寸 ---- 6.4516 cm2 平方厘米
1 sq foot[ft2] 平方英尺 144 in2 平方英寸 0.0929 m2 平方米
1 sq yard[yd2] 平方码 9 ft2 平方英尺 0.8361 m2 平方米
1 acre 英亩 4840 yd2 平方码 4046.9 m2 平方米
1 sql mile[mile2] 平方英里 640 acre 英亩 2.59 km2 平方千米
体积/容量Volume/Capacity
Imperial英制 Meric公制
1 fluid ounce 液量蛊司 1.048 UK fl oz 英制液量蛊司 29.574 ml 毫升
1 pint(16 fl oz 液量品脱)品脱 0.8327 UK pt 英制品脱 0.4731 l 升
1 gallon 加仑 0.8327 UK gal 英制加仑 3.7854 l 升
重量Weight
Imperial英制 Meric公制
1 ounce[oz]蛊司 437.5 grain 格令 28.35 g 克
1 pound[lb]磅 16 oz 蛊司 0.4536 kg 千克
1 stone 石 14 lb 磅 6.3503 kg 千克
1 hundredweight[cwt] 英担 112 lb 磅 50.802 kg 千克
1 long ton(UK) 长顿 20 cwt 英担 1.061 t 顿
  • Processing Cost: N/A